New Jersey officials, which have oversite of the Atlantic City government, declined comment. The Atlantic City Council also passed a resolution approving execution of the memorandum.Īs part of the deal, DEEM Enterprises can “do their diligence on the Bader Field site,” the mayor said in a statement issued last month. signed a memorandum of understanding with the developer, a step that allows site redevelopment to move forward. In March, Atlantic City Mayor Marty Small Jr. Binder said the US Army Corps of Engineers would dredge surrounding back bays and have spoils used for elevation.ĭEEM also needs to clean up an underground plume of old aviation fuel plus fuel from a former public works site at Bader Field and recap it, according to principal Kevin Dixon of Dixon Associates Engineering. The development project is not without challenges.īinder said the project requires elevating Bader Field -which is located on a flood zone between the Atlantic Ocean and back bay-to 6 ft at one end and 35 ft at the other. The city owns Bader Field, which closed in 2006. Opening in 1910, the the 143-acre Bader Field was among the nation’s first airports and the first municipal facility. For instance, Binder said it would turn off lighting when owners leave their condos and turn the power back on upon return. The project would also use a network operations center, allowing IT teams to manage and monitor Renaissance. A project rendering shows solar panels on condo roofs and other available roof space throughout the design. He said a microgrid would provide energy generation and distribution for Renaissance, which also would use hydrogen.
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |